Get a Quote
Get a Quote
A 680 kW roof over refrigeration load, sequenced so no dock ever closed.

Build notes
A refrigerated warehouse draws hardest in the hours the array produces most, which made this the simplest economic case we have priced in years. The build was the hard part.
Dock traffic never stopped. Roof access was limited to one bay at a time and every lift was scheduled against the shipping calendar rather than ours.
Every lift was scheduled against the shipping calendar rather than ours.
The array now covers 41% of annual site consumption and the whole of the summer refrigeration peak.
Project facts
Measured result
Metered over a full cooling season against the design model, with refrigeration load logged in parallel.