2.4 MW across four distribution roofs, installed in phases with no production days lost.

Build notes
Fairview runs four distribution buildings on a single meter and a refrigerated night shift. The array had to go up over live loading docks without closing one of them.
Ballast rather than penetration was decided in the first week. Every roof was TPO membrane still under warranty with eleven years left on it, so nothing on this project is fixed through the deck.
The ballast plan was stamped per building — the four roofs were built a decade apart and none of them shared a live-load allowance. That is also why the array runs on eight string inverters rather than one central unit: any building can be isolated without taking the site off export.
The two coldest months were spent on the two roofs with the lightest dock traffic. Nobody at Fairview had to reroute a truck.
Final tie-in ran over one weekend shutdown already on the site calendar. The full drawing set and commissioning report are available on request.