Get a Quote
Get a Quote

01 — Residential Solar
Oversized arrays sold on estimated yield, then short every winter.
Twelve months of interval data, panel level optimisers, stamped mounting.
8–14 kW · 6–8 weeks to commissioning · 25 year warranty.
02 — Commercial & Industrial
Projects stall between the structural engineer and the utility queue.
One contract: structural review, filing, phased install, commissioning.
250 kW to 2.4 MW · phased roof access · no production days lost.


03 — Battery Storage & EV
Batteries bolted on later, sized by catalogue, not by demand.
Hybrid inverters, critical load subpanel, tariff aware dispatch.
13–40 kWh · retrofit onto any array · one day install.
Integration schematic
A hybrid inverter and a critical-load subpanel are what make backup automatic rather than manual.
Panel-level optimisers, string-monitored per roof plane.
Decides in real time: house, battery, or grid.
Critical loads carried for up to ten hours, switching automatically.
Net export metered and reported quarterly.
Standards & compliance
Board-certified designers and installers on every job, residential and commercial.
Inverters certified for grid-support functions and rapid shutdown.
Current-cycle compliance for PV wiring, disconnects and labelling.
Permit filing, inspection scheduling and utility interconnection handled by us in all twelve states.

Questions
If your question isn't here, an engineer — not a salesperson — will answer it.
How long does a typical installation take?
What does the twenty five year warranty actually cover?
Do you subcontract the installation crew?
How do I know the production numbers are real?
Can storage be added to an existing system?