home image

solutions

One standard. Three systems.

Roofs differ, the method does not. Every Cascade array is engineered, installed and monitored by the same licensed team.

48 MW installed

99.2% uptime

3,400 systems live

installed by our own crews

company
42%
Average bill reduction across 2,900 homes

01 — Residential Solar

A house is a load profile, not a roof size

Problem

Oversized arrays sold on estimated yield, then short every winter.

Approach

Twelve months of interval data, panel level optimisers, stamped mounting.

Typical system

8–14 kW · 6–8 weeks to commissioning · 25 year warranty.

02 — Commercial & Industrial

Interconnection is the schedule, not the panels

Problem

Projects stall between the structural engineer and the utility queue.

Approach

One contract: structural review, filing, phased install, commissioning.

Typical system

250 kW to 2.4 MW · phased roof access · no production days lost.

home image
2.4 MW
Largest single install — Fairview Logistics, live since May 2026
battery
10 hr
Backup on a typical retrofit, installed in a single day

03 — Battery Storage & EV

Production is only half of an energy system

Problem

Batteries bolted on later, sized by catalogue, not by demand.

Approach

Hybrid inverters, critical load subpanel, tariff aware dispatch.

Typical system

13–40 kWh · retrofit onto any array · one day install.

Integration schematic

Where storage sits between the array and your panel

A hybrid inverter and a critical-load subpanel are what make backup automatic rather than manual.

DC
Array

Panel-level optimisers, string-monitored per roof plane.

DC → AC
Hybrid inverter

Decides in real time: house, battery, or grid.

Storage
Battery + subpanel

Critical loads carried for up to ten hours, switching automatically.

AC
Main panel & grid

Net export metered and reported quarterly.

NABCEP

Board-certified designers and installers on every job, residential and commercial.

UL 1741 SB

Inverters certified for grid-support functions and rapid shutdown.

NEC 690

Current-cycle compliance for PV wiring, disconnects and labelling.

Local AHJ

Permit filing, inspection scheduling and utility interconnection handled by us in all twelve states.

solution image
Fairview Logistics — 2.4 MW across four distribution roofs
14 wk
Survey to interconnect
+4%
Above modelled yield

Questions

Before you sign anything

If your question isn't here, an engineer — not a salesperson — will answer it.